Note: Information as of 10 January 2026. All figures in USD unless otherwise stated.
| Compare | Company | Market Cap (M) Market Cap (M) is the total market value of a company's outstanding shares, calculated by multiplying the company's stock price by the total number of outstanding shares. | Project | Location | Type of Graphite Type of Graphite refers to the classification of graphite based on its characteristics such as purity, flake size, and crystalline form. *PSG - Purified Spherical Graphite *AAM - Active Anode Material | Status of Project Status of Project indicates the current stage of development or production of the graphite mining project. | NPV Net Present Value (NPV) is the value of all future cash flows (positive and negative) over the entire life of an investment discounted to the present. | Deposit Size (Ore Reserve) Deposit Size (Ore Reserve) refers to the estimated amount of economically recoverable graphite ore in a mining deposit. | MRE (Mineral Resource Estimate) MRE (Mineral Resource Estimate) refers to the total estimated amount of a mineral resource, which includes both measured and indicated resources. | Vertically Integrated Vertically Integrated indicates whether the company is involved in multiple stages of the graphite supply chain, from mining to processing to end-use applications. | Capacity (TPA) Capacity (TPA) refers to the production capacity of a graphite mining or processing facility, measured in metric tons per annum (TPA). | Cost (Per Tonne) Cost (Per Tonne) indicates the average cost incurred by the company to produce one metric ton of product outlined by the type of graphite produced. |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Alkeemia | Not Listed | Porto Marghera Plant | Italy | Purified natural graphite (battery-grade) | Commissioning | - | - | - | - | 20,000 | - | |
| AMG Graphite | Not Listed | Bogala Graphite | Sri Lanka | Vein | Production | - | - | - | - | - | - | |
| AMG Graphite | Not Listed | Qingdao Kropfmühl Graphite | China | Flake | Production | - | - | - | - | - | - | |
| Applied Graphite Technologies | 1.51 | Queens Mine Complex | Sri Lanka | Vein | Development | - | - | - | - | 50,000 | 0 | |
| Argyle Resources | 4.59 | Frenchvale | Canada | Flake | Exploration | - | - | - | - | - | - | |
| Armadale Capital | 0 | Mahenge Graphite Project | Tanzania | Flake | Development stage | 430M/10% | - | 20.4Mt @ 9.8% TGC | - | 90,000 | 369 | |
| Bahia Graphite | Not Listed | Itaitu Project | Brazil | Natural flake graphite (small - jumbo flake) | Exploration/Feasibility | - | - | 2.28 Mt @ 9.05% | - | - | - | |
| Bahia Graphite | Not Listed | Lajedo Project | Brazil | Natural flake graphite (small - jumbo flake) | Exploration/Feasibility | - | - | - | - | - | - | |
| Battery Mineral Resources | 21.24 | Guemam | South Korea | Flake | Exploration | - | - | - | - | - | - | |
| Battery Mineral Resources | 21.24 | Taehwa | South Korea | Flake | Exploration | - | - | - | - | - | - | |
| Beowulfmining | 8.4 | Aitolampi Graphite Project | Finland | Flake | Exploration | - | - | 26.7Mt @ 4.8% TGC | Yes | 0 | - | |
| Beowulfmining | 8.4 | Graphite Anode Materials Plant | Finland | CSPG | Feasibility | 242M/8% | - | - | Yes | 60,000 | - | |
| BGV Graphite | Not Listed | Zarichna Graphite | Ukraine | Flake | Feasibility | - | 33Mt @ 5.76% TGC | - | - | - | - | |
| BGV Graphite | Not Listed | Balahovskoe Graphite (Concentrate) | Ukraine | Flake | Feasibility | - | 44Mt @ 5.4% TGC | - | Yes | 50,000 | - | |
| BGV Graphite | Not Listed | Balahovskoe Graphite (Processing) | Ukraine | PSG | Feasibility | - | - | - | Yes | 19,000 | - | |
| Black Rock Mining | 28.72 | Mahenge Mine | Tanzania | High Purity Flake | Construction-ready | 1.4B/10% | 70Mt at 8.5% TGC | 213Mt @ 7.8% TGC | - | 340,000 | 518 | |
| Black Swan Graphene | 41.2 | Black Swan Mine | Australia | Graphene | Collaboration with various entities | - | - | - | - | 0 | - | |
| Blencowe Resources | 45.67 | Orom-Cross Graphite Project | Uganda | Flake | Feasibility | 482M/ 8% | - | 24.5Mt @ 6% TCG | - | 101,000 | 499 | |
| BTR | Not Listed | Kendal Anode Plant (Phase 1) | Indonesia | Anode Material | Production | - | - | - | Yes | 160,000 | - | |
| BTR | Not Listed | Tangier Tech Anode Plant | Morocco | Anode Material | Construction | - | - | - | Yes | 60,000 | - | |
| BTR | Not Listed | Shenzhen Manufacturing Center | China | Anode Material | Limited Public Info | - | - | - | Yes | - | - | |
| BTR | Not Listed | Huizhou BTR | China | High Temperature Graphitization | Limited Public Info | - | - | - | Yes | - | - | |
| BTR | Not Listed | Ruian New Materials | China | Artificial graphite anode material | Limited Public Info | - | - | - | Yes | - | - | |
| BTR | Not Listed | Ningxia Ruiding | China | Artificial graphite anode material | Limited Public Info | - | - | - | Yes | - | - | |
| BTR | Not Listed | Hebei Kuntian | China | Graphitization | Limited Public Info | - | - | - | Yes | - | - | |
| BTR | Not Listed | Shenzhen Guangming Base | China | Anode Material | Limited Public Info | - | - | - | Yes | - | - | |
| BTR | Not Listed | Shanxi Ruijun | China | Artificial graphite anode material | Limited Public Info | - | - | - | Yes | - | - | |
| BTR | Not Listed | Yibin Jinshi | China | 0 | Limited Public Info | - | - | - | Yes | - | - | |
| BTR | Not Listed | Jixi BTR | China | Spherical Graphite / high Purity Graphite | Limited Public Info | - | - | - | Yes | - | - | |
| BTR | Not Listed | Tianjin BTR | China | Artificial Graphite | Limited Public Info | - | - | - | Yes | - | - | |
| BTR | Not Listed | Jiangsu New Materials | China | Artificial Graphite, Anode materials | Limited Public Info | - | - | - | Yes | - | - | |
| BTR | Not Listed | Sichuan BTR | China | Artificial graphite anode material | Limited Public Info | - | - | - | Yes | - | - | |
| BTR | Not Listed | Qingdao Luowei | China | Natural graphite purification base | Limited Public Info | - | - | - | Yes | - | - | |
| BTR | Not Listed | Shandong Yida | China | Needle Coke | Limited Public Info | - | - | - | Yes | - | - | |
| BTR | Not Listed | Shanxi BTR | China | High temperature purification, graphitization processing | Limited Public Info | - | - | - | Yes | - | - | |
| BTR | Not Listed | Yunnan Base | China | Artificial graphite anode material | Limited Public Info | - | - | - | Yes | - | - | |
| BTR | Not Listed | Henan Ruifeng | China | Graphitization base | Limited Public Info | - | - | - | Yes | - | - | |
| BTR | Not Listed | Ruiyang, Shandong | China | Artificial graphite anode material | Limited Public Info | - | - | - | Yes | - | - | |
| BTR | Not Listed | Changyuan Mining | China | Natural graphite | Development/Production (integrated) | - | - | - | Yes | - | - | |
| Buxton Resources | 8.08 | The Graphite Bull Project | Australia | Flake | Exploration | - | - | 4.0Mt @ 16.2% TGC | - | 0 | - | |
| Canada Carbon | 2.62 | Miller Mine | Canada | Flake | Care and Maintnance | - | - | - | - | - | - | |
| Canada Carbon | 2.62 | Asbury Mine | Canada | Flake | Care and Maintnance | - | - | 4.14Mt @ 3.05% TCG | - | - | - | |
| CarbonScape | Not Listed | Blenheim Pilot Plant | New Zealand | Sustainable Biographite | Pilot Plant | - | - | - | Yes | 3 | - | |
| CarbonScape | Not Listed | Sunila Demonstration Plant | Finland | Sustainable Biographite | Construction | - | - | - | Yes | 100 | - | |
| CarbonScape | Not Listed | Commercial Plant | Europe | Sustainable Biographite | Feasibility | 316M/15% | - | - | Yes | 25,000 | 4930 | |
| CarbonScape | Not Listed | Commercial Plant | USA | Sustainable Biographite | Feasibility | 555M/15% | - | - | Yes | 25,000 | 4333 | |
| Castle Minerals | 6.96 | Kambale Graphite project | Ghana | Flake | Exploration | - | - | 22.4Mt @ 8.6% TCG | - | 0 | - | |
| Ceylon Graphite | 2.22 | K1 Development | Sri Lanka | Vein | Production | - | - | - | - | 0 | - | |
| Ceylon Graphite | 2.22 | M1 Development | Sri Lanka | Vein | Exploration | - | - | - | - | 0 | - | |
| Ceylon Graphite | 2.22 | H1 Development | Sri Lanka | Vein | Exploration | - | - | - | - | 0 | - | |
| Ceylon Graphite | 2.22 | P1 Development | Sri Lanka | Vein | Exploration | - | - | - | - | 0 | - | |
| Cullinan Metals | 0.35 | Lac-Des-Iles West Graphite Project | Canada | Flake | Exploration | - | - | - | - | 0 | - | |
| DH Mining | Not Listed | Nipepe | Mozambique | Flake | Production | - | - | - | - | 100,000 | - | |
| EcoGraf | 115.72 | Epanko | Tanzania | Flake | Development-ready | 348M/10% (Pre Tax) | 14.3Mt @ 8.8% TGC | 290.8Mt at 7.2% TGC | - | 73,000 | 508 | |
| EcoGraf | 115.72 | Mechanical Shaping Facility | Tanzania | PSG | Feasibility | - | - | - | Yes | - | - | |
| EcoGraf | 115.72 | Purification Facility | Australia | CSPG | Feasibility | - | - | - | Yes | - | - | |
| Elcora Advanced Materials | 1.84 | Sakura graphite mine | Sri Lanka | Vein | Production | - | - | - | - | 0 | - | |
| Elemental Advanced Materials | Not Listed | Synthetic graphene | USA | Synthetic graphene | Production | - | - | - | - | - | - | |
| Elemental Advanced Materials | Not Listed | Carbon nano onions | USA | Carbon nano onions | Production | - | - | - | - | - | - | |
| Emergent Metals | 1.86 | Casa Berardi | Canada | Flake | Exploration | - | - | - | - | 0 | - | |
| Epinikon | Not Listed | Vodňany Plant | Czech Republic | Graphite powders, dispersions, graphene | Production | - | - | - | - | - | - | |
| E-Power Resources | 4.69 | Tetepisca | Canada | Flake | Exploration | - | 4.7Mt @ 27.8% TCG | >100Mt @ 14% TCG | - | 0 | - | |
| E-Power Resources | 4.69 | Turgeon | Canada | Flake | Exploration | - | - | - | - | 0 | - | |
| Evion | 11.97 | Maniry Project | Madagascar | Flake | Development stage | 263M/ 8% (Pre Tax) | 16.2Mt @ 6.6 TCG | 40Mt @ 6.5% TCG | Yes | 60,000 | - | |
| Evion | 11.97 | Panthera Graphite Technologies | India | Expandable | Production | 100M (Pre tax) | - | - | Yes | 5,000 | - | |
| Evion | 11.97 | Battery Anode Material Project | Germany | CSPG | Feasibility | - | - | - | - | 0 | - | |
| Evolution Energy Minerals | 3.6 | Chilalo Project | Tanzania | Flake | Development stage | 338M/8% | 8Mt @ 10.5% TCG | 67.3Mt @ 5.4% TCG | - | 52,000 | 773 | |
| Evolution Energy Minerals | 3.6 | AAM Project | TBD | CSPG | Feasibility | - | - | - | Yes | - | - | |
| Falcon Energy Materials | 70.28 | Lola Graphite Project | Republic of Guinea | Flake | Feasibility | 218M/8% | 0 | 46.3Mt @ 4.09% TCG | - | 100,000 | 587.6 | |
| Falcon Energy Materials | 70.28 | AAM Project | Morocco | CSPG | Feasibility | - | - | - | Yes | 25,000 | - | |
| First Graphene | 44.74 | PureGRAPH® | Australia | Graphene | Production | - | - | - | - | 1,000 | - | |
| Focus Graphite | 36.85 | Lac Knife | Canada | Flake | Feasibility | 285.7M/8% | 9,31Mt @ 14.97% TCG | 12Mt @ 15.34% TCG | - | 50,000 | 540.48 | |
| Focus Graphite | 36.85 | Lac Tétépisca | Canada | Flake | Exploration | - | - | 59.3Mt @ 10.61% | - | 0 | - | |
| Global Li-Ion Graphite | 0.98 | Amabato Arana mine | Madagascar | Flake | Care and Maintnance | - | - | - | - | 0 | - | |
| GR4FITE3 | Not Listed | Zavalievsky Mine | Ukraine | Flake | Production | - | - | 22.9Mt @ 6.8% TGC | - | 7,300 | - | |
| GrafTech | 438.94 | Calais Electrode Facility | France | Electrode | Production | - | - | - | - | - | - | |
| GrafTech | 438.94 | Pamplona Electrode & Pin Facility | Spain | Electrode/Connecting Pin | Production | - | - | - | - | - | - | |
| GrafTech | 438.94 | Monterrey Electrode & Pin Facility | Mexico | Electrode/Primary Pin | Production | - | - | - | - | - | - | |
| GrafTech | 438.94 | St. Marys Machining Facility | USA | Electrode/Pin machining | Partially idled (electrode production suspended in 2024) | - | - | - | - | - | - | |
| GrafTech | 438.94 | Seadrift Needle Coke Plant | USA | Petroleum Needle Coke | Production | - | - | - | - | 140,000 | - | |
| Graphano Energy | 2.66 | Lac Aux Bouleaux Graphite | Canada | Flake | Exploration | - | - | - | - | 0 | - | |
| Graphano Energy | 2.66 | Dudley and Lac Vert-Bouthillier graphite | Canada | Flake | Exploration | - | - | - | - | 0 | - | |
| Graphano Energy | 2.66 | Standard Property | Canada | Flake | Exploration | - | - | - | - | 0 | - | |
| Graphcoa | Not Listed | Graphcoa | Brazil | Flake | Early stage production | - | - | - | Yes - Urbix | 65,500 | - | |
| Graphinex | Not Listed | Esmeralda Graphite Project | Australia | Flake | Feasibility | - | - | - | Yes | 0 | - | |
| Graphinex | Not Listed | Esmeralda Graphite Project | Australia | CSPG | Feasibility | - | - | - | Yes | 0 | - | |
| Graphite One | 265.25 | Graphite Creek | USA | Flake | Feasibility | 1.36B/8% | - | 37.6Mt @ 5.1% TCG | Yes | 183,000 | - | |
| Graphite One | 265.25 | Advanced Graphite Materials Manufacturing | USA | CSPG | Exploration | - | - | - | Yes | 25,000 | - | |
| Gratomic | 4.33 | Aukam Graphite Project | Namibia | Vein | Exploration | - | - | - | - | 22,000 | - | |
| Gratomic | 4.33 | Buckingham Graphite | Canada | Flake | Exploration | - | - | - | - | 0 | - | |
| Gratomic | 4.33 | Jacobina and Igrapiuna Graphite | Brazil | Flake | Exploration | - | - | - | - | 0 | - | |
| Gratomic | 4.33 | Capim Grosso | Brazil | Flake | Exploration | - | - | - | - | 0 | - | |
| Green Africa Minerals | Not Listed | Morogoro Graphite project | Tanzania | Flake | Exploration | - | - | - | - | 0 | - | |
| Green Battery Minerals | 0 | Berkwood Graphite Project | Canada | Flake | Exploration | - | - | - | - | 0 | - | |
| Green Critical Minerals | 26.95 | McIntosh | Australia | High Purity Flake | Feasibility | 272M AUD (Pre tax) | - | 30.2Mt @ 4.4% TCG | - | 0 | - | |
| Green Graphite Tech | Not Listed | GraphPure™ / GraphRenew™ / GraphRestore™ | Canada | CSPG | Demostration Plant | - | - | - | Yes | 20,000 | - | |
| Greenroc Strategic Materials | 11.43 | Amitsoq Graphite Project | Greenland | Flake | Feasibility | 621M/ 8% (Combined) | - | 23.05Mt @ 20.41% TCG | Yes | 80,000 | - | |
| Greenroc Strategic Materials | 11.43 | Amitsoq AAM Project | Norway | CSPG | Feasibility | 621M/ 8% (Combined) | - | - | Yes | 39,700 | 1872 | |
| Greenwing Resources | 12.38 | Graphmada | Madagascar | Flake | Care and Maintnance | - | - | 61.9Mt at 4.5% TCG | - | 0 | - | |
| HAZER Group | 88.82 | Commercial Demonstration Plant | Australia | Hazer Graphite | - | - | - | - | - | 0 | - | |
| International Graphite | 8.42 | Springdale Graphite Project | Australia | Flake | Feasibility | 603M (AUD - Combined) | - | 49.3Mt @ 6.5% TCG | Yes | 50,000 | 485 | |
| International Graphite | 8.42 | Collie Downstream Processing | Australia | AAM | Feasibility | 603M (AUD - Combined) | - | - | Yes | 18,000 | - | |
| Invert Graphite | 4.83 | Morogoro Graphite Project | Tanzania | Flake | Exploration | - | - | - | - | 0 | - | |
| iTech | 7.67 | Campoona Project | Australia | Flake | Exploration | - | - | 8.55Mt @ 9% TCG | - | 0 | - | |
| Kahatagaha | Not Listed | Kahatagaha | Sri Lanka | Vein | Production | - | - | - | - | - | - | |
| Kingsland Minerals | 5.94 | Leliyn Graphite Project | Australia | Flake | Feasibility | - | - | 194.6Mt @ 7.3% TCG | - | - | - | |
| Leading Edge Materials | 45 | Woxna Graphite | Sweden | Flake | Care and Maintnance | 317M/8% (Pre tax) | - | 10.8Mt @7.72% TCG | Yes | 16,584 | - | |
| Leading Edge Materials | 45 | Woxna Graphite (CSPG) | Sweden | CSPG | Feasibility | 317M/8% (Pre tax) | - | - | Yes | 7,435 | 0 | |
| Lincoln Minerals | 25.98 | Kookaburra Graphite | Australia | Flake | Feasibility | 77M/10% (Pre Tax) | - | 12.8Mt @7.6% TCG | Yes | 60,000 | 517 | |
| Lincoln Minerals | 25.98 | BAM Project | Australia | PSG | Feasibility | - | - | - | Yes | - | - | |
| Lithium Energy | 27.71 | Battery Anode Material | Australia | PSG | - | - | - | - | Yes | 0 | - | |
| Lomiko Metals | 6.57 | La Loutre Project | Canada | Flake | Feasibility | $185M/8% (CAD) | 0 | 64.7Mt at 4.59% TCG | - | 97,400 | 406 | |
| Magnis Energy Technologies | 33.68 | Nachu Project | Tanzania | Flake | Development-ready | 1.2B/10% | 76.3Mt @ 4.8% TCG | 174Mt @ 5.4% TCG | - | 236,000 | 639 | |
| Magnis Energy Technologies | 33.68 | iM3NY Lithium-ion Battery Plant | USA | Batteries | Refer to MNS Anncouemnets | - | - | - | - | 0 | - | |
| Margosa | Not Listed | Ridee Ganga | Sri Lanka | Vein | Exploration | - | - | 2.5Mt @ 78.19%TCG | - | - | - | |
| Margosa | Not Listed | Aluketiyā | Sri Lanka | Vein | Exploration | - | - | - | - | - | - | |
| Margosa | Not Listed | Dumbara | Sri Lanka | Vein | Exploration | - | - | - | - | - | - | |
| Margosa | Not Listed | Waharaka | Sri Lanka | Vein | Exploration | - | - | - | - | - | - | |
| Margosa | Not Listed | Kithulgala | Sri Lanka | Vein | Exploration | - | - | - | - | - | - | |
| Margosa | Not Listed | Ridee Ganga | Sri Lanka | Vein | Exploration | - | - | 2.5Mt @ 78.19%TCG | - | - | - | |
| Margosa | Not Listed | Aluketiyā | Sri Lanka | Vein | Exploration | - | - | - | - | - | - | |
| Margosa | Not Listed | Dumbara | Sri Lanka | Vein | Exploration | - | - | - | - | - | - | |
| Margosa | Not Listed | Waharaka | Sri Lanka | Vein | Exploration | - | - | - | - | - | - | |
| Margosa | Not Listed | Kithulgala | Sri Lanka | Vein | Exploration | - | - | - | - | - | - | |
| Marula Mining | 7.12 | Bagamoyo Graphite Mine | Tanzania | Flake | Exploration | - | - | - | - | - | - | |
| Marula Mining | 7.12 | Nyorinyori and Nyorigreen Graphite Mine | Tanzania | Flake | Exploration | - | - | - | - | - | - | |
| Mason Resources | 11.58 | Shareholder of Black Swan Graphene Inc | 0 | - | - | - | - | - | - | 0 | - | |
| Metals Australia | 12.23 | Lac Carheil | Canada | Flake | Feasibility | 123M/8% (Pre Tax) | - | 13.3Mt @ 11.5% TCG | - | 100,000 | 433 | |
| Metals Australia | 12.23 | BAM Project | Canada/USA | PSG | Feasibility | - | - | - | Yes | - | - | |
| Mineral Commodities | 17.11 | Skaland (Traelen) Mine | Norway | Flake | Production | 52M/7% | 0.640Mt @ 24.8% TCG | 1.84Mt @ 23.6% TCG | Yes | 15,000 | 396 | |
| Mineral Commodities | 17.11 | Munglinup Graphite Project | Australia | Flake | Feasibility | 124M/7% | 4.24Mt @ 12.8%TCG | 7.99Mt @ 12.2% TCG | Yes | 52,000 | 538 | |
| Mineral Commodities | 17.11 | Active Anode Materials Plant (Carbo) | Norway | AAM | Feasibility | 821M/7% | - | - | Yes | 51,000 | 1610 | |
| NEO Battery Materials | 65.61 | Silicon Anode Project | South Korea | Silicon Anodes | - | - | - | - | - | 0 | - | |
| NextSource Materials | 55.26 | Molo Mine | Madagascar | SuperFlake® graphite concentrate | Production | 370M/8% | 0 | 23.62Mt @ 6.32% | Yes | 150,000 | 638.53 | |
| NextSource Materials | 55.26 | Battery Anode Facilities | Port Louis - Mauritius | CSPG | Feasibility | - | - | - | Yes | 0 | - | |
| NGX Limited | 8.18 | Malingunde | Malawi | Flake | Feasibility | 119M/10% | 9.5Mt @ 9.5% TGC | 65Mt @ 7.2% TGC | - | 52,000 | 396 | |
| NGX Limited | 8.18 | Nanzeka | Malawi | Flake | Exploration | - | - | 0 | - | - | - | |
| NGX Limited | 8.18 | Duwi | Malawi | Flake | Feasibility | - | - | 85.9Mt @ 7.1% TGC | - | - | - | |
| NGX Limited | 8.18 | Lifidzi | Malawi | Flake | Exploration | - | - | - | - | - | - | |
| NGX Limited | 8.18 | Msinja | Malawi | Flake | Exploration | - | - | - | - | - | - | |
| NGX Limited | 8.18 | AAM Project | Malawi | CSPG | Feasibility | - | - | - | Yes | - | - | |
| NH3 Clean Energy | 39.93 | McIntosh | Australia | Flake | Care and Maintnance | - | - | 61.9Mt at 4.5% TCG | - | 0 | - | |
| NH3 Clean Energy | 39.93 | Ceylon Graphite Project | USA | Flake | Exploration/Drilling | - | - | - | - | 0 | - | |
| Noble Mineral Exploration | 11.39 | Buckingham | Canada | Flake | Exploration | - | - | - | - | 0 | - | |
| Northern Graphite | 26.53 | Bissett Creek Project | Canada | Flake | Development-ready | - | - | - | - | 44,000 | - | |
| Northern Graphite | 26.53 | Okanjande Mine | Namibia | Flake | Care and Maintnance | - | - | - | - | 31,000 | - | |
| Northern Graphite | 26.53 | Lac des Iles Mine | Canada | Flake | Production | - | - | - | - | 15,000 | - | |
| Northern Graphite | 26.53 | Battery Anode Material from Baie-Comeau | Canada | CSPG | Feasibility | - | - | - | Yes | 200,000 | - | |
| Nouveau Monde Graphite | 458.45 | Matawinie Project | Canada | Flake | Development | $252M/8% | 59.8 Mt @ 4.35% | - | Yes | 106,000 | $419 | |
| Nouveau Monde Graphite | 458.45 | Lac Gueret (Uatnan) Project | Canada | Flake | Development | C$2.2B/8% | 65.64Mt @ 17.2% | - | Yes | 500,000 | C$268 | |
| Nouveau Monde Graphite | 458.45 | Becancour Battery Material Plant | Canada | AAM | Development | $801M/8% | - | - | Yes | 44,000 | $2810 | |
| Novonix | 317.34 | Novonix Anode Material | USA | Synthetic | Production | - | - | - | - | 20,000 | - | |
| Novonix /Lithium Energy | 0 | Corella Graphite | Australia | Flake | Exploration | - | - | - | - | 0 | - | |
| Novonix/Lithium Energy | 0 | Burke/Mt Dromedary/Corella | Australia | Flake | Exploration | - | - | - | - | 0 | - | |
| OAR Resources | 0 | Oar Graphite Project | Australia | Flake | Exploration/Drilling | - | - | 13.47Mt @ 3.3% TG | - | 0 | - | |
| POSCO Future M | 10795.74 | Sejong Anode Material Plant No. 1 | South Korea | Anode Material - Natural | Production | - | - | - | - | 26,000 | - | |
| POSCO Future M | 10795.74 | Sejong Anode Material Plant No.2 | South Korea | Anode Material - Natural | Production | - | - | - | - | 48,000 | - | |
| POSCO Future M | 10795.74 | Pohang (Artificial) Anode Material Plant | South Korea | Anode Material - Synthetic | Production | - | - | - | - | 8,000 | - | |
| POSCO Future M | 10795.74 | Saemangeum | South Korea | PSG | Construction | - | - | - | - | 37,000 | - | |
| POSCO International | Not Listed | Investments in Mines | Globally | Flake | Production | - | - | - | - | - | - | |
| Pula Group | Not Listed | Ruangwa Project | Tanzania | Natural flake graphite (high-grade deposit) | Feasibility | - | - | - | - | - | - | |
| Quantum Graphite | 77.35 | Uley Graphite Project | Australia | Flake | Feasibility | - | - | 7.2Mt @ 10.5% TGC | - | 100,000 | 401 | |
| Renascor Resources | 141.18 | Siviour Mine | Australia | Flake | Advanced development | $1.5B/10% (Combined) | 61.8Mt @ 7% TCG | 123.6Mt @ 6.9% TCG | Yes | 150,000 | 405 | |
| Renascor Resources | 141.18 | Bolivar Facility | Australia | PSG | Development stage | $1.5B/10% (Combined) | - | - | Yes | 100,000 | 1782 | |
| Ruby Graphite | Not Listed | Ruby Graphite Project | USA | Natural flake & vein graphite deposit | Exploration | - | - | - | - | - | - | |
| Sarvisto Graphite | Not Listed | Sarvisto Graphite | Sweden | Flake | Development | - | - | 4.2MT @ 20.7% TGC | - | 0 | - | |
| Sarytogan Graphite | 13.3 | Sarytogan Graphite Project | Kazakhstan | Multiple | Feasibility | $518M/8% (Combined & Pre Tax) | 8.6Mt @ 30% TCG | 229MT @ 28.9%TCG | Yes | 0 | - | |
| Sarytogan Graphite | 13.3 | Kenesar Graphite Exploration Project | Kazakhstan | Flake | Exploration | - | - | - | - | 0 | - | |
| Sayona Mining | 0 | Kimberley Graphite Project | Australia | Flake | Exploration | - | - | - | - | 0 | - | |
| South Star Battery Metals | 11.71 | Santa Cruz Project | Brazil | Flake | Early stage production | 81.2M/5% | - | 12.3 Mt @ 2.4% | Yes | 50,000 | 396 | |
| South Star Battery Metals | 11.71 | BamaStar Project (USA) | USA | Flake | Exploration/Drilling | - | - | - | Yes | 100,000 | - | |
| South Star Battery Metals | 11.71 | AAM | USA | AAM | Feasibility | 1.6B/8% | - | - | Yes | 61,800 | 2625 | |
| Sovereign Metals | 255.2 | KASIYA RUTILE-GRAPHITE PROJECT | Malawi | Flake | Feasibility | - | - | 23.4Mt @ 1.32% | - | 244,000 | 404 | |
| Superior Graphite | Not Listed | Chicago Plant #1 | USA | Grinding and Blending | Production | - | - | - | - | - | - | |
| Superior Graphite | Not Listed | Chicago Plant #4 | USA | Ultra-Fine Processing | Production | - | - | - | - | - | - | |
| Superior Graphite | Not Listed | Hopkinsville Plant | USA | Thermal Purification | Production | - | - | - | - | - | - | |
| Superior Graphite | Not Listed | Sundsvall Plant | Sweden | Thermal Purification | Production | - | - | - | - | - | - | |
| Syrah Resources | 284.99 | Balama Mine | Mozambique | Flake | Production | 1.1B/10% | 110Mt @ 16% TCG | 1036Mt @ 12% TCG | Yes | 350,000 | 430 | |
| Syrah Resources | 284.99 | Vidalia Facility | USA | AAM | Early stage production | 208 - 794M 10% | - | - | Yes | 45,000 | 3023 | |
| Talga Group | 130.11 | Vittangi Project | Sweden | Flake | Development stage | - | - | - | - | 120,000 | - | |
| Talga Group | 130.11 | Luleå Anode Refinery | Sweden | AAM | Feasibility | - | - | - | - | 19,500 | - | |
| Tirupati Graphite | 11.63 | Vatomina | Madagascar | Flake | Production | - | - | 18.4Mt @ 4.6% TCG | - | 36,000 | - | |
| Tirupati Graphite | 11.63 | Sahamamy | Madagascar | Flake | Production | - | - | 7.1Mt @ 4.2% TCG | - | 18,000 | - | |
| Tirupati Graphite | 11.63 | Montepuez | Mozambique | Flake | Development-ready | - | - | 76.9Mt @ 7.3% TCG & 42.6Mt @ 9.5% TCG | - | 250,000 | - | |
| Tirupati Graphite | 11.63 | Balama Central | Mozambique | Flake | Development-ready | - | - | 21.9Mt @ 10.2% TCG & 11Mt @ 10.2% TCG | - | 100,000 | - | |
| Titan Mining | 259.94 | Kilbourne Graphite Project | USA | Flake | Exploration | - | - | - | - | 0 | - | |
| Triton Minerals | 13.63 | Ancuabe Graphite Project | Mozambique | Flake | Feasibility | 298M /10% (Pre tax) | 24.9Mt @ 6.2% | 46.1Mt @ 6.6% TCG | - | 70,000 | 634 | |
| Triton Minerals | 13.63 | Cobra Plains Graphite Project | Mozambique | Flake | Exploration | - | - | 103Mt @ 5.2% TCG | - | 0 | - | |
| Urbix | Not Listed | Advanced Graphite Processing Facility | USA | CSPG | Development | - | - | - | Yes - Graphcoa | 10,000 | - | |
| Vianode | Not Listed | Via ONE | Norway | Synthetic graphite anode material (low-CO₂) | Production | - | - | - | - | 2,000 TPA (current Phase 1) 20,000 TPA | - | |
| Vianode | Not Listed | Via TWO | USA | Synthetic graphite anode material (low-CO₂) | Development | - | - | - | - | 70,000 | - | |
| Vianode | Not Listed | VTC | Norway | Synthetic graphite anode material (low-CO₂) | R&D | - | - | - | - | - | - | |
| Volt Carbon Technologies | 6.72 | Lochaber | Canada | Flake | Exploration | - | - | - | - | - | - | |
| Volt Resources | 34.45 | Zavalievsky Mine | Ukraine | Flake | Production | - | - | 22.9Mt @ 6.8% TGC | Yes | 7,300 | - | |
| Volt Resources | 34.45 | Bunyu Mine | Tanzania | Flake | Feasibility | 36.4M/7.5% | 127Mt at 4.4% TGC | 461Mt @ 4.9 TCG | Yes | 170,000 | 670 | |
| Volt Resources | 34.45 | Alabama Facility | USA | AAM | Feasibility | - | - | - | Yes | 7,500 | - | |
| Walkabout Resources | 0 | Lindi Jumbo Project | Tanzania | Flake | Company in Administration | 197M/10% | 5.5Mt @ 17.9% TCG | 41.8Mt & 10.8% TCG | - | 40,000 | 347 | |
| Westwater Resources | 119.17 | Kellyton Plant | USA | AAM | Development | 1.4B/8% | - | - | Yes | 50,000 | N/A | |
| Westwater Resources | 119.17 | Coosa Project | USA | Flake | Feasibility | 190M/ 8% | - | - | Yes | 99,000 | - | |
| Westwater Resources | 119.17 | BAMA Mine Project | USA | Flake | Exploration | - | - | - | Yes | 0 | - | |
| Westwater Resources | 119.17 | Kellyton Plant | USA | AAM | Development | 1.4B/8% | - | - | Yes | 50,000 | N/A | |
| Zenteck | Not Listed | Albany deposit | Canada | Flake | Feasibility | - | - | - | - | - | - |